A105 Carbon Steel Tee for Fire Protection
For industrial sourcing
Prepare a clearer RFQ
Include the details below so RELIA can understand the part and discuss the next step with you.
- Drawing, sample, or reference standard
- Material grade and preferred process
- Dimensions, tolerances, and surface finish
- Application, target quantity, and destination
Production timing, packing, and shipping terms are confirmed for each project after specifications and trade terms are agreed.
-
warranty1 Yearcustomized supportOEM
-
TechnicFORGEDConnectivityWelding
-
shapeEqualhead codeHexagon
-
Overall LengthCustomized SizeHeightCustomized Size
-
Surface TreatmentPaintingPressureHigh Pressure
-
System of MeasurementMetricMounting hole diameterCustomized Size
-
Pipe FeaturesOtherPipe ClassOther
-
ApplicationOtherThread TypesCustomized Size
This carbon steel tee listing targets fire-protection piping and includes A105, ASTM and GOST references. The image supports a tee form, although the selectable type is labeled Reducer. Confirm the exact component and approved drawing before assigning its connection, material package or project acceptance status.
Settle the actual threaded or welded ends
The title specifies Threaded while the table records Welding. Its Thread Types field gives only Customized Size, so no actual thread designation or supplied end arrangement is established. Request the mating-interface drawing, dimensions and tolerances for the selected component before choosing a connection.
For a requested threaded arrangement, define the actual thread designation and inspection requirements. For welding, agree end preparation and joint acceptance. Confirm run and branch dimensions, bore, wall, center-to-end and any Hexagon features on the drawing. The broad size range does not provide these ordered values.
Clarify material and standard acceptance
Identify the exact ASTM and GOST requirements, editions and component scope needed for the project. Confirm how the A105 reference applies to the supplied fitting, with actual grade, condition, traceability and inspection records. Selectable carbon steel and a234wpb labels are not certificates of conformity.
The image contains printed markings, but they do not establish the material, dimensions or certification of the order. Obtain the actual production documentation supporting Forged. Specify Painting coverage, surface acceptance and coating inspection, and agree dimensional units rather than relying on the Metric and inch-range entries alone.
Confirm fire-system project requirements
Provide the actual system medium, pressure, temperature, transients, testing and joint requirements. High Pressure and Other class do not state numerical allowable limits. Establish any required fire-service listing or approval for the selected component, then agree material and end inspections, documentation, marking, preservation and delivery against the project acceptance criteria.






Technical information for every product inquiry
Prepare the requirement before final product confirmation.
The product page is a starting point. Drawings, samples, interfaces, materials, quantities and acceptance requirements are reviewed before stock matching or custom production is confirmed.
Discuss this product in your project context.
Share the available drawing, sample, reference, target quantity and application information. Unknown items can remain open for review.