DN1500 Carbon Steel Welded Tee for Municipal Water
For industrial sourcing
Prepare a clearer RFQ
Include the details below so RELIA can understand the part and discuss the next step with you.
- Drawing, sample, or reference standard
- Material grade and preferred process
- Dimensions, tolerances, and surface finish
- Application, target quantity, and destination
Production timing, packing, and shipping terms are confirmed for each project after specifications and trade terms are agreed.
-
warranty1 Yearcustomized supportOEM
-
TechnicFORGEDConnectivityWelding
-
shapeEqualhead codeHexagon
-
Overall LengthCustomized SizeHeightCustomized Size
-
Surface TreatmentPaintingPressureHigh Pressure
-
System of MeasurementMetricMounting hole diameterCustomized Size
-
Pipe FeaturesOtherPipe ClassOther
-
ApplicationOtherThread TypesCustomized Size
This painted carbon steel welded tee listing targets municipal water supply and includes DN1500 and Equal references. The selectable type is labeled Reducer. Confirm the actual ordered component and run-to-branch drawing before accepting a nominal-size description or geometry for the municipal installation.
Resolve DN1500 and the equal-branch configuration
The original image supports tee forms but shows branches that appear smaller than the run. It does not establish a measured reduction ratio or confirm Equal supply. Request actual run and branch nominal sizes, diameters, bore, wall and center-to-end dimensions on the approved drawing.
DN1500 is a nominal reference, not an outside diameter, wall thickness or branch measurement. Resolve the selected option mapping and define welding end preparation, mating-pipe details and tolerances. Hexagon, Customized Size and Metric entries do not provide those values, so agree explicit units and inspection criteria for the selected fitting.
Confirm supplied material and municipal surface requirements
Request actual grade, condition, traceability and material inspection records. Carbon Steel and a234wpb labels are not certificates for the order. Clarify Welded connection versus component construction and obtain production evidence supporting the Forged table reference rather than deciding a manufacturing route from the family image.
Specify the Painting system, covered surfaces, water-contact and external surface acceptance, plus inspection requirements. Municipal use and dark appearance do not prove potable-water compliance or corrosion performance. Agree actual treatment documentation, handling and preservation for the large fitting together with material, branch and end records.
Set water-system operating and delivery acceptance
Provide composition, treatment chemicals, contaminants, pressure, temperature, cycles, transients and installation loads. High Pressure and Other class do not state numerical allowable limits. Evaluate the confirmed material, geometry, joint and surface package against the actual municipal duty, then agree inspections, documentation, marking, protection and delivery before approval.






Technical information for every product inquiry
Prepare the requirement before final product confirmation.
The product page is a starting point. Drawings, samples, interfaces, materials, quantities and acceptance requirements are reviewed before stock matching or custom production is confirmed.
Discuss this product in your project context.
Share the available drawing, sample, reference, target quantity and application information. Unknown items can remain open for review.