Cold-Rolled ERW Carbon Steel Pipe for Oil Applications

Link copied successfully

For industrial sourcing

Prepare a clearer RFQ

Include the details below so RELIA can understand the part and discuss the next step with you.

  • Drawing, sample, or reference standard
  • Material grade and preferred process
  • Dimensions, tolerances, and surface finish
  • Application, target quantity, and destination

Production timing, packing, and shipping terms are confirmed for each project after specifications and trade terms are agreed.

Product description
  • Invoicing
    By Actual Weight
    Oiled or Non-oiled
    Non-oiled
  • Section Shape
    Round
    Surface Treatment
    Cold Rolled
  • Tolerance
    ±1%
    Alloy Or Not
    Non-Alloy
  • Application
    Fluid Pipe, Drill Pipe, Hydraulic Pipe, Gas Pipe, Oil Pipe
    Certificate
    API , ISO 9001
  • Delivery Time
    8 ~ 14 days
    Grade
    carbon steel
  • Outer Diameter
    219 - 1066 mm
    Special Pipe
    API Pipe, Other, EMT Pipe, Thick Wall Pipe
  • Standard
    ASTM
    Technique
    ERW

This cold-rolled ERW carbon steel pipe is listed for oil applications with an A108 reference in the title. The table identifies ERW manufacture and a non-oiled supply condition. Clarify the governing specification and selected material before treating the standard wording as verified conformity for this pipe.

Establish the applicable material and product specification

Ask how the A108 reference applies to the offered product form and manufacturing route. Request the exact document, edition, grade and supply condition together with the relevant evidence. Do not substitute another pipe standard merely to complete the enquiry or assume that a title reference establishes acceptance.

Obtain traceable chemistry and property records for the selected material. Define the ERW manufacturing inspections and tests required by the agreed scope. API and ISO 9001 labels in the table need actual certificates, issuers, validity and applicable scope rather than interpretation as product approval.

Confirm the cold-rolled pipe size and inspection basis

Outside diameter is listed as 219–1066 mm. The two actual variants pair a 6–20 mm thickness range with 12 m or 6 m length. Specify one diameter, wall and length combination with the required ends, then verify that complete configuration is offered.

The ±1% tolerance needs an identified measurement and acceptance limits. Agree dimensional, straightness, ovality and weld checks appropriate to the selected specification. Confirm round section and cold-rolled surface; non-oiled condition does not establish a protective coating or corrosion performance for the intended exposure.

Define the oil service for material and joint review

Provide the oil composition, relevant fluid characteristics, pressure, temperature, cycling and loading for assessment of the proposed material, joints and rating. Agree project tests and documentation. The oil application label gives no numerical operating limit, and the broader drilling, hydraulic or EMT categories do not verify separate qualifications.

Technical information for every product inquiry

Prepare the requirement before final product confirmation.

The product page is a starting point. Drawings, samples, interfaces, materials, quantities and acceptance requirements are reviewed before stock matching or custom production is confirmed.

Discuss this product in your project context.

Share the available drawing, sample, reference, target quantity and application information. Unknown items can remain open for review.

Related Products for Your Sourcing Review

JIS B2312 90-Degree Carbon Steel Elbow, Butt-Weld Enquiry
316L Slip-On Flange for Water Treatment
Painted Carbon Steel Equal Tee for Underground Water
Steel Pipe for Steam Boiler Systems
ASME B16.5 Weld Neck Flange for Oil and Gas
SCH80 Long-Radius 6-Inch 45-Degree Stainless Elbow, Chemical Construction Enquiry
A234 WPB Carbon Steel Welding Equal Tee | Custom-Size Gas Enquiry
ANSI/ASME B16.5 DN150 A106 Carbon Steel CNC-Machined Blind Flange