C3 1605 ball screw high precision left hand thread ball screw 40 mm od 1500 mm long lead screw manufacturer

Link copied successfully

For industrial sourcing

Prepare a clearer RFQ

Include the details below so RELIA can understand the part and discuss the next step with you.

  • Drawing, sample, or reference standard
  • Material grade and preferred process
  • Dimensions, tolerances, and surface finish
  • Application, target quantity, and destination

Production timing, packing, and shipping terms are confirmed for each project after specifications and trade terms are agreed.

Product description
  • Condition
    New
    Warranty
    3 months
  • Applicable Industries
    Advertising Company
    Weight (KG)
    5
  • Showroom Location
    Egypt
    Video outgoing-inspection
    Provided
  • Machinery Test Report
    Provided
    Marketing Type
    New Product 2020
  • Warranty of core components
    1 Year
    Core Components
    Bearing
  • Manufacturing Process
    Rolled Thread
    Material
    GCr15, Stainless Steel,Brass,Aluminum,Carbon steel,copper
  • Length
    100-6000mm(Custmized ), 15-6000MM,
    Product name
    stainless steel ball screw
  • Keyword
    ball screw nut
    Service
    OEM Services
  • Produce name
    miniature ball screw
    Application
    Cnc Machining Parts
  • Type
    CNC Machine Ball Lead Screw

The C3 1605 Ball Screw is a high-precision left-hand thread ball screw designed for various industrial applications, particularly in CNC machining. With a diameter of 40 mm and an impressive length of 1500 mm, this lead screw is engineered to deliver exceptional performance and accuracy.

Manufactured from high-quality materials such as GCr15, stainless steel, brass, aluminum, carbon steel, and copper, the C3 ball screw is built to withstand the rigors of demanding environments. The rolled thread manufacturing process ensures durability and reliability, making it an ideal choice for advertising companies and other industries that require precision components.

This product is brand new and comes with a three-month warranty, ensuring peace of mind for your investment. Core components, including bearings, are guaranteed to last up to one year, underlining the quality that goes into every C3 ball screw. Each unit weighs 5 kg and is subject to thorough inspection, complete with a machinery test report and video outgoing inspection to meet the highest standards.

The versatility of the C3 1605 Ball Screw allows for customization in length, with options ranging from 100 mm to 6000 mm, catering to specific project requirements. It’s also available for OEM services, making it easier for businesses to integrate this component into their systems seamlessly.

Whether you're in need of miniature ball screws or CNC machine ball lead screws, the C3 1605 offers a reliable solution to enhance your operations. Elevate your machinery's performance with this superior ball screw, a cornerstone of modern CNC machining parts.

Technical information for every product inquiry

Prepare the requirement before final product confirmation.

The product page is a starting point. Drawings, samples, interfaces, materials, quantities and acceptance requirements are reviewed before stock matching or custom production is confirmed.

Discuss this product in your project context.

Share the available drawing, sample, reference, target quantity and application information. Unknown items can remain open for review.

Related Products for Your Sourcing Review

304 Stainless Steel Waterproof Blind Rivet
Factory price hollow bolt stainless steel brass carbon steel banjo bolt hollow screws
Standard ASME B18.31.2 / B18.2.2 Full Thread UN UNC UNF Stainless Steel Threaded Rod Stud Bolt
12mm 14mm 16mm 20mm Nut Trapezoidal Lead Screw T10 Lead Screw Brass for 3d Printer Lead Screw
Factory Direct Galvanized White Blue Zinc Plated DIN6334 Hex Coupling Long Hexagon Nut