Grade C A106 Steel Pipe for Power Plant Boilers
産業調達向け
明確なRFQを準備
RELIAが部品内容を理解し、次のステップを協議できるよう、以下をご提示ください。
- 図面、サンプル、または参照規格
- 材質グレードと希望製法
- 寸法、公差、表面処理
- 用途、予定数量、納入先
製造納期、梱包、出荷条件は、仕様と取引条件の合意後に案件ごとに確定します。
-
InvoicingBy Actual WeightOiled or Non-oiledNon-oiled
-
Section ShapeRoundSurface TreatmentHot Rolled
-
Tolerance±1%Alloy Or NotNon-Alloy
-
ApplicationFluid Pipe, Drill Pipe, Hydraulic Pipe, Gas Pipe, Oil PipeCertificateAPI , ISO 9001
-
Delivery Time8 ~ 14 daysGradecarbon steel
-
Outer Diameter219 - 1066 mmSpecial PipeAPI Pipe, Other, EMT Pipe, Thick Wall Pipe
-
StandardASTMTechniqueSaw
This Grade C A106 steel pipe is listed for power plant boiler enquiries with SA106, SCH40 and SCH80 references. High-pressure and seamless wording also appears alongside Saw technique. Define the selected supply and its project acceptance requirements before treating the combined title as a verified boiler specification.
Identify the governing boiler material documentation
Specify the required document, edition, Grade C condition and selected scope under A106 or SA106. Request the records relevant to that project rather than assuming automatic dual certification from the two references. Material traceability, properties, inspection and tests should identify the actual pipe offered.
Provide boiler medium, operating temperature, pressure, cycling and mechanical loads for material, joint and rating assessment. Include the applicable project approval requirements. High-pressure wording supplies neither a numerical operating limit nor boiler certification, and approval cannot be established solely from a grade name.
Match the schedule to a confirmed dimensional configuration
SCH40 and SCH80 are title alternatives without dedicated variants. Select one schedule against the nominal size, dimensional basis and actual wall. The table diameter range is 219–1066 mm; the two variants pair 6–20 mm thickness with either 12 m or 6 m length.
Confirm a complete diameter, wall, length and end configuration rather than assuming every range combination corresponds to both schedules. Define the measurement covered by ±1% and agree relevant geometry and dimensional inspections. A schedule designation does not itself provide a pressure rating for the selected boiler duty.
Clarify manufacture and verify the selected supply records
Ask how the seamless description relates to Saw and obtain manufacturing evidence without assigning Saw a welding or cutting meaning. Confirm round, hot-rolled and non-oiled condition. Actual API or ISO 9001 certificates need scope and validity checks; EMT wording does not establish another qualification or replace the boiler acceptance package.






すべての製品照会に必要な技術情報
製品の最終確認前に要件を整理します。
製品ページは出発点です。在庫適合や特注生産の確定前に、図面、サンプル、接続、材質、数量、受入要件を確認します。
案件の条件に沿ってこの製品を検討します。
現在の図面、サンプル、参照品、数量、用途情報をお送りください。不明点は未確定のまま検討できます。