Double Seal Socket Joint Epoxy Steel Pipe
Pour l’approvisionnement industriel
Préparez une RFQ plus claire
Indiquez les éléments ci-dessous afin que RELIA comprenne la pièce et discute avec vous de la prochaine étape.
- Plan, échantillon ou norme de référence
- Nuance du matériau et procédé préféré
- Dimensions, tolérances et finition de surface
- Application, quantité cible et destination
Délais de production, emballage et conditions d’expédition sont confirmés pour chaque projet après accord sur les spécifications et conditions commerciales.
-
InvoicingBy Theoretical WeightOiled or Non-oiledSlightly Oiled
-
Section ShapeRoundSurface TreatmentHot Rolled
-
Tolerance±15%Alloy Or NotNon-Alloy
-
ApplicationFluid Pipe, Boiler Pipe, Drill Pipe, Hydraulic Pipe, Gas Pipe, Oil Pipe, Chemical Fertilizer Pipe, Structure PipeCertificateCE, ISO 9001
-
Delivery Time31 ~ 45 daysGradecarbon steel
-
Outer Diameter150 - 350Processing ServiceWelding, Punching, Cutting, Bending, Decoiling
-
Special PipeAPI Pipe, EMT Pipe, Thick Wall PipeStandardASTM
This double-seal socket-joint epoxy steel pipe enquiry concerns industrial water supply. The title describes fusion-bonded painted epoxy, high pressure and corrosion resistance, while the options provide thickness 1.2 and three lengths. Confirm the finished pipe, joint and coating specification before selecting a supply configuration.
Confirm units for thickness and outside diameter
The available lengths are 12 m, 6 m and 6.4 m. Thickness 1.2 has no stated unit, and the table outer-diameter range 150–350 also lacks a unit and individual allocation. Request actual outside diameter, bore, wall thickness and dimensional units rather than assuming millimetres.
Allocate the listed ±15% tolerance to its intended property and agree acceptance limits for length, wall, roundness and straightness. Obtain the complete steel designation, manufacturing route, condition, heat traceability and applicable ASTM document. Generic ASTM or API/EMT labels do not identify a certified specification.
Define both seals and the finished epoxy system
Request socket geometry, insertion depth, engagement, seal dimensions/material, assembly method and joint inspection requirements. Agree compatibility with the transported medium. A double-seal description alone does not establish pressure performance, allowable movement or an approved installation procedure.
Confirm fusion-bonded epoxy construction, internal/external coverage, surface preparation, coating thickness, cure and inspection. Reconcile Hot Rolled and Slightly Oiled entries with the finished coating and end-surface requirements. Surface appearance or corrosion-resistant wording cannot replace documented coating acceptance.
Approve the selected water-supply duty
State actual medium, pressure, temperature, cycling, exposure and loads; request potable-water approval if relevant. Other listed industrial applications need separate assessment. Verify the scope and validity of CE/ISO 9001 references, then agree joint testing, handling, marking, material/coating records and quotation scope.






Informations techniques pour chaque demande produit
Préparez le besoin avant la confirmation finale du produit.
La page produit est un point de départ. Plans, échantillons, interfaces, matières, quantités et réception sont examinés avant confirmation du stock ou de la fabrication.
Discutez de ce produit dans le contexte de votre projet.
Partagez plan, échantillon, référence, quantité et application. Les points inconnus peuvent rester ouverts.