ERW Carbon Steel Pipe for Oil and Gas Conveyance
Pour l’approvisionnement industriel
Préparez une RFQ plus claire
Indiquez les éléments ci-dessous afin que RELIA comprenne la pièce et discute avec vous de la prochaine étape.
- Plan, échantillon ou norme de référence
- Nuance du matériau et procédé préféré
- Dimensions, tolérances et finition de surface
- Application, quantité cible et destination
Délais de production, emballage et conditions d’expédition sont confirmés pour chaque projet après accord sur les spécifications et conditions commerciales.
-
InvoicingBy Actual WeightOiled or Non-oiledNon-oiled
-
Section ShapeRoundSurface TreatmentCold Rolled
-
Tolerance±1%Alloy Or NotNon-Alloy
-
ApplicationFluid Pipe, Drill Pipe, Hydraulic Pipe, Gas Pipe, Oil PipeCertificateAPI , ISO 9001
-
Delivery Time8 ~ 14 daysGradecarbon steel
-
Outer Diameter219 - 1066 mmSpecial PipeAPI Pipe, Other, EMT Pipe, Thick Wall Pipe
-
StandardASTMTechniqueERW
This ERW welded carbon steel pipe enquiry covers oil, hydraulic fluid and gas conveyance. The listing records round, non-alloy steel with cold-rolled processing and non-oiled supply. Its ASTM reference remains generic, so the specific material and acceptance requirements must be agreed for the actual order.
Define the fluid and connection requirements
Identify the transported medium and its composition, contaminants and operating conditions. Provide pressure, temperature, cycling and external loads for assessment of the selected pipe and joints. Oil, gas and hydraulic labels do not establish identical compatibility requirements or a common allowable pressure.
Specify the required end arrangement, joint preparation and inspection criteria. Hydraulic applications may also need defined bore finish and cleanliness. Those details should be stated explicitly; the catalogue does not establish a honed bore, sour-fluid qualification or a particular finished hydraulic supply.
Confirm the actual specification and dimensional selection
Ask the supplier for the numbered ASTM specification, edition, grade and condition applicable to the offered pipe. Obtain chemical, mechanical, ERW weld and traceability records, and clarify the cold-processing sequence. A standard used for another product should not be imported into this enquiry.
The variants offer 6 m or 12 m length with a 6–20 mm thickness entry, alongside a 219–1066 mm outside-diameter field. Select one exact diameter, wall and length combination. Define the dimension covered by ±1%, the measurement method, straightness and ovality limits and actual availability.
Agree preservation and inspection before delivery
Cold Rolled does not specify a protective coating. Agree storage, preservation and any required treatment for non-oiled supply. Request certificate documents and scope where API or ISO 9001 evidence is required, then confirm tests, project acceptance, actual-weight invoicing and the listed 8–14-day delivery wording for the selected pipe.






Informations techniques pour chaque demande produit
Préparez le besoin avant la confirmation finale du produit.
La page produit est un point de départ. Plans, échantillons, interfaces, matières, quantités et réception sont examinés avant confirmation du stock ou de la fabrication.
Discutez de ce produit dans le contexte de votre projet.
Partagez plan, échantillon, référence, quantité et application. Les points inconnus peuvent rester ouverts.