P11/P22 Steel Pipe for Petrochemical Refineries

链接复制成功

工业采购项目

准备更清晰的 RFQ

请提供以下信息,帮助 RELIA 理解零件要求并与您确认下一步。

  • 图纸、样品或参考标准
  • 材料牌号和首选工艺
  • 尺寸、公差和表面处理
  • 应用、目标数量和目的地

生产周期、包装和运输条款将在规格与贸易条件确认后按项目确定。

商品描述
  • Invoicing
    By Actual Weight
    Oiled or Non-oiled
    Non-oiled
  • Section Shape
    Round
    Surface Treatment
    Cold Rolled
  • Tolerance
    ±1%
    Alloy Or Not
    Is Alloy
  • Application
    Fluid Pipe, Drill Pipe, Hydraulic Pipe, Gas Pipe, Oil Pipe
    Certificate
    API , ISO 9001
  • Delivery Time
    8 ~ 14 days
    Grade
    Alloy steel
  • Outer Diameter
    219 - 1066 mm
    Special Pipe
    API Pipe, Other, EMT Pipe, Thick Wall Pipe
  • Standard
    ASTM
    Technique
    ERW

This P11/P22 steel pipe listing addresses petrochemical refinery enquiries with A335, chrome-moly and high-temperature wording. Its title also says carbon steel, while the table identifies alloy steel. Obtain a precise material definition before adopting either classification or the combined specification for an order.

Resolve material and manufacturing scope for the enquiry

Select P11 or P22 with its required full supply condition and governing document. Request chemistry, properties, treatment and heat traceability records for the offered pipe. The two grade names do not establish equivalence or confirm that both are available in every listed dimensional combination.

ERW is recorded in the title and technique field. Ask how that actual manufacturing route meets the proposed A335 scope, supported by the applicable edition and inspection evidence. Do not declare combined conformity or substitute a different manufacturing route solely to reconcile the source wording.

Specify dimensions and selected inspection criteria

The outside diameter range is 219–1066 mm. Thickness is listed as 6–20 mm, with either 12 m or 6 m length in the two variants. Choose the complete diameter, wall, length and end configuration and obtain confirmation of that specific supply.

Define the dimensional basis of ±1% and the accepted weld, end and geometry inspections for the chosen specification. Confirm round section, cold-rolled surface and non-oiled condition. The EMT option is not represented by a separate variant or qualification record, so clarify it independently if relevant.

Assess the refinery temperature and process exposure

Provide process medium, composition, temperature, pressure, cycling and loading for selected material, joint and rating review. High-temperature wording provides no numerical limit or corrosion guarantee. Agree project testing and material documentation, and verify actual API or ISO 9001 certificate scope and validity where applicable to the proposed supply.

每个产品询价都需要的技术信息

在最终确认产品前先整理需求。

产品页只是起点。在确认库存匹配或定制生产前,我们会评审图纸、样品、接口、材料、数量及验收要求。

结合您的项目场景讨论该产品。

提供现有图纸、样品、参考件、目标数量及应用信息。尚不确定的项目可留待评审。

采购评估相关产品

平焊板式碳钢/不锈钢法兰
WPB Carbon Steel Pipe Cap for Oil and Gas
墙体防护橡胶护角
浮式疏浚工程用大口径法兰吸排砂泥浆20英寸外径橡胶软管
法兰端柔性不锈钢编织金属软管膨胀节
燃气烟道用矩形柔性波纹金属伸缩补偿器
化工耐腐蚀不锈钢波纹钢丝编织 PTFE 柔性金属软管
8英寸DN50/DN100 160mm PN10/PN16弹性橡胶座铸铁闸阀