DIN Class 300 Forged Carbon Steel Blind Flange Enquiry

链接复制成功

工业采购项目

准备更清晰的 RFQ

请提供以下信息,帮助 RELIA 理解零件要求并与您确认下一步。

  • 图纸、样品或参考标准
  • 材料牌号和首选工艺
  • 尺寸、公差和表面处理
  • 应用、目标数量和目的地

生产周期、包装和运输条款将在规格与贸易条件确认后按项目确定。

商品描述
  • Surface Treatment
    Other
    Application
    Pipe Lines Connect
  • Bolt Hole Diameter
    11-42
    Bolt Hole Quantity
    11-42

This DIN Class 300 forged blind-flange enquiry requires material reconciliation: the title states Carbon Steel, while the sole actual variant lists Stainless Steel. The 160 MM size label and Blind Flange option identify the request without completing its material or dimensional specification. Confirm the selected item before ordering.

Verify the closure item and its material certificate

Request written identification for the actual variant, with its exact material specification, edition and traceability. Do not choose between the conflicting materials from colour or finish. The reviewed gallery examples have open centres, so obtain a photograph and section drawing of the intended blind closure. Those gallery forms should not silently replace the actual Blind Flange option or establish what will be supplied.

Give the size label and both bolt fields separate meanings

Ask whether 160 MM denotes nominal pipe size, outside diameter or another measurement. Record the closure's actual outside diameter, thickness, facing and gasket contact details. The table repeats 11-42 for both Bolt Hole Diameter and Bolt Hole Quantity; that does not provide a selected hole diameter and count. Confirm each value, units, bolt circle and spacing on the inspected drawing, then match them to the mating flange and bolting. A single size label cannot establish an available range or complete compatibility.

Document the DIN and Class 300 acceptance basis

Obtain the exact numbered standard, edition and class designation rather than substituting an unstated standard. Class 300 needs a documented material-temperature basis and does not supply a fixed allowable pressure. Verify Forged with production evidence and specify the required sealing-face and surface condition beyond Other. Pipe Lines Connect does not qualify closure duty. Provide actual fluid, corrosion, pressure, temperature and mechanical loads for assessment of the confirmed closure, mating flange, gasket and bolting before acceptance.

每个产品询价都需要的技术信息

在最终确认产品前先整理需求。

产品页只是起点。在确认库存匹配或定制生产前,我们会评审图纸、样品、接口、材料、数量及验收要求。

结合您的项目场景讨论该产品。

提供现有图纸、样品、参考件、目标数量及应用信息。尚不确定的项目可留待评审。

采购评估相关产品

ASME B16.5 A105 Carbon Steel RF Class 300 WN Flange Enquiry
Forged Threaded Flange for Chemical Plant Piping
Carbon Forged Steel DN400 Pipe Flange, SAE/ASME/ISO Type Enquiry
FBE-Coated Flange for Buried and Marine Pipelines
DN150 B16.5 A106 Carbon Steel Polished Blind Flange | Gas Enquiry
PN16 Flange for Industrial Piping
ANSI B16.5 Carbon Steel Flange Enquiry — WN / Blind Selection
A105 Class 300 Slip-On Flange for Fire Protection