Steel Tube for Petrochemical Heat Exchangers
工业采购项目
准备更清晰的 RFQ
请提供以下信息,帮助 RELIA 理解零件要求并与您确认下一步。
- 图纸、样品或参考标准
- 材料牌号和首选工艺
- 尺寸、公差和表面处理
- 应用、目标数量和目的地
生产周期、包装和运输条款将在规格与贸易条件确认后按项目确定。
-
InvoicingBy Actual WeightOiled or Non-oiledNon-oiled
-
Section ShapeRoundSurface TreatmentCold Rolled
-
Tolerance±1%Alloy Or NotNon-Alloy
-
ApplicationFluid Pipe, Drill Pipe, Hydraulic Pipe, Gas Pipe, Oil PipeCertificateAPI , ISO 9001
-
Delivery Time8 ~ 14 daysGradestainless steel
-
Outer Diameter219 - 1066 mmSpecial PipeAPI Pipe, Other, EMT Pipe, Thick Wall Pipe
-
StandardASTMTechniqueERW
This tube listing addresses petrochemical heat exchangers using ASTM A213, T22 alloy and seamless wording. The retained specification table instead includes Non-Alloy, stainless steel and ERW. Confirm what material and construction will actually be supplied before comparing the tube with an exchanger requirement.
Resolve T22 supply and tube specification coverage
Obtain the ordered material specification, grade, condition, traceability and inspection documents. Actual T22 or stainless supply cannot be established from the competing classifications. Request manufacturing records to determine seamless or ERW production. Bundled round tubes and blue end covers in the original photograph do not verify either grade or route.
Identify the ASTM A213 edition, applicable product coverage and required conformity package for the selected order. General API and ISO 9001 labels do not demonstrate heat-exchanger approval. Establish the actual material properties needed by the project through accepted documentation rather than inferring heat resistance or corrosion behaviour from title wording.
Define the exchanger tube geometry and end requirements
Choose a specific wall within the listed 6–20 mm range and identify whether the order uses the 12 m or 6 m length option. Specify outside diameter, bore, length, straightness, roundness and ends on the exchanger drawing. The broad 219–1066 mm diameter entry needs reconciliation with the actual tube position and mating parts.
Agree the measurement scope and acceptance basis for ±1%. Confirm the supplied Cold Rolled finish, Non-oiled condition and protection of ends and surfaces. State the required end preparation and joint criteria; the photograph cannot establish dimensional fit, surface cleanliness or suitability for the proposed exchanger connection.
Assess the actual petrochemical exchanger conditions
Identify the exchanger side, fluid composition, contaminants, pressure, temperature, thermal cycling, gradients and loads. Evaluate the confirmed material condition, geometry and joints against this duty. Agree material, surface, dimensional, end and required project tests with explicit criteria and traceable reports before accepting the supply.






每个产品询价都需要的技术信息
在最终确认产品前先整理需求。
产品页只是起点。在确认库存匹配或定制生产前,我们会评审图纸、样品、接口、材料、数量及验收要求。
结合您的项目场景讨论该产品。
提供现有图纸、样品、参考件、目标数量及应用信息。尚不确定的项目可留待评审。