ASTM A53 Type E Grooved Steel Pipe SCH40
Per l’approvvigionamento industriale
Prepara una RFQ più chiara
Includi i dati seguenti per aiutare RELIA a comprendere il componente e definire il passo successivo.
- Disegno, campione o norma di riferimento
- Grado materiale e processo preferito
- Dimensioni, tolleranze e finitura superficiale
- Applicazione, quantità obiettivo e destinazione
Tempi di produzione, imballaggio e condizioni di spedizione vengono confermati per ogni progetto dopo l’accordo su specifiche e condizioni commerciali.
-
InvoicingBy Theoretical WeightOiled or Non-oiledSlightly Oiled
-
Section ShapeRoundSurface TreatmentGalvanized
-
Tolerance±10%, ±1%Alloy Or NotNon-Alloy
-
ApplicationFluid Pipe, Boiler Pipe, Drill Pipe, Hydraulic Pipe, Gas Pipe, Oil Pipe, Chemical Fertilizer Pipe, Structure PipeCertificateCE, ISO 9001
-
Delivery Time31 ~ 45 daysGradecarbon steel
-
Outer Diameter150 - 350Processing ServiceWelding, Punching, Cutting, Bending, Decoiling
-
Special PipeAPI Pipe, EMT Pipe, Thick Wall PipeStandardASTM
This ASTM A53 Type E steel pipe enquiry specifies grooved ends and SCH40, with a length inconsistency. The title states 9.1 inches, while actual variants list 12 m, 6 m and 6.4 m. Confirm the ordered length and intended interpretation before using either record for procurement or installation planning.
Reconcile the length and Schedule 40 wall selection
Ask the supplier whether the title length is applicable, erroneous or refers to another documented feature. The existing metre-length options remain unchanged pending clarification. Do not reinterpret 9.1 inches as a diameter or another measurement without an accepted drawing or corrected source specification.
Thickness 1.2 has no unit, and outer diameter 150–350 also lacks units and selected allocation. Obtain nominal size, bore, outside diameter and actual wall with units. Verify Schedule 40 for the intended size rather than equating it automatically with the unitless thickness entry.
Confirm the Type E pipe and grooved connection
Request the full A53 material designation, governing edition, Type E manufacturing evidence, condition, traceability and certificates. Assign ±10% and ±1% to their specific properties and agree dimensional acceptance. Generic ASTM and special-pipe labels are insufficient evidence of the selected specification.
Obtain groove profile, dimensions, end preparation, manufacturing method and tolerances. Match the coupling, gasket and fasteners through accepted connection records. Define galvanizing coverage and groove/end protection, and clarify Slightly Oiled against the final finish rather than assuming every surface has that condition.
Approve hydraulic operation with the actual assembly
Provide medium, temperature, pressure, cycling, loads and installation requirements. High Pressure alone gives no numerical duty. Verify applicable CE/ISO 9001 documents, then agree connection testing, alignment, support, inspection, marking, handling, material/dimensional records and quotation scope for the selected pipe.






Informazioni tecniche per ogni richiesta prodotto
Prepara i requisiti prima della conferma finale del prodotto.
La pagina prodotto è un punto di partenza. Disegni, campioni, interfacce, materiali, quantità e accettazione vengono verificati prima di confermare stock o produzione.
Valuta questo prodotto nel contesto del tuo progetto.
Condividi disegno, campione, riferimento, quantità e applicazione. I punti non definiti possono restare aperti.