Grade B ERW Steel Pipe for Oil and Drill Enquiries
Para compras industriales
Prepare una RFQ más clara
Incluya estos datos para que RELIA comprenda la pieza y pueda acordar el siguiente paso.
- Plano, muestra o norma de referencia
- Calidad del material y proceso preferido
- Dimensiones, tolerancias y acabado superficial
- Aplicación, cantidad objetivo y destino
Los plazos de producción, el embalaje y el envío se confirman para cada proyecto tras acordar especificaciones y condiciones comerciales.
-
InvoicingBy Actual WeightOiled or Non-oiledNon-oiled
-
Section ShapeRoundSurface TreatmentCold Rolled
-
Tolerance±1%Alloy Or NotNon-Alloy
-
ApplicationFluid Pipe, Drill Pipe, Hydraulic Pipe, Gas Pipe, Oil PipeCertificateAPI , ISO 9001
-
Delivery Time8 ~ 14 daysGradecarbon steel
-
Outer Diameter219 - 1066 mmSpecial PipeAPI Pipe, Other, EMT Pipe, Thick Wall Pipe
-
StandardASTMTechniqueERW
This oil and drilling enquiry describes ERW, cold-rolled non-alloy steel pipe with a Grade B reference under A53. The table identifies carbon steel, while the actual options specify thickness and length. Confirm the intended grade and supply condition through the selected order documents.
Separate oil pipe duty from the drilling role
Identify whether the pipe is intended to convey oil, form part of process equipment or serve a defined drilling function. These roles need different operating and mechanical assessments. A Drill Pipe label alone does not establish drill-string connection compatibility, torsional capacity or fatigue performance.
For fluid service, provide composition, contaminants, pressure, temperature and operating cycles. For a drilling proposal, describe the actual mechanical role, loads, connections and acceptance criteria. The application wording does not independently qualify sour-fluid or hydrogen service or provide a numerical pressure limit.
Confirm material records and cold-rolled condition
Request the relevant A53 edition and selected Grade B material records, including condition, chemistry, mechanical properties, ERW production and inspection evidence. Clarify what the cold-rolled field means for the offered manufacturing sequence. It does not by itself establish a precision bore or particular finished surface.
API and ISO 9001 entries require documents and scope confirmation where specified. Likewise, broad API or EMT special-pipe labels do not replace the requirements for the chosen role. Agree traceability, weld inspection and any additional tests as part of procurement.
Select dimensions and arrange supply acceptance
The options offer 6 m and 12 m lengths with a 6–20 mm thickness entry; outer diameter is listed as 219–1066 mm. Choose the exact combination and clarify the dimension covered by ±1%. Define end details, straightness and ovality, then confirm availability, non-oiled preservation, storage, actual-weight invoicing and the stated 8–14-day delivery wording.






Información técnica para cada consulta
Prepare los requisitos antes de confirmar el producto.
La página es el punto de partida. Planos, muestras, interfaces, materiales, cantidades y criterios de aceptación se revisan antes de confirmar stock o fabricación.
Comente este producto en el contexto de su proyecto.
Comparta plano, muestra, referencia, cantidad y aplicación. Los puntos desconocidos pueden quedar abiertos para revisión.