A53 Concentric / Eccentric Swage NPT Nipple | Grade B Enquiry
للتوريد الصناعي
جهّز RFQ أكثر وضوحًا
أدرج المعلومات التالية كي تفهم RELIA القطعة وتناقش معك الخطوة التالية.
- رسم أو عينة أو معيار مرجعي
- درجة المادة والعملية المفضلة
- الأبعاد والتفاوتات وتشطيب السطح
- الاستخدام والكمية والوجهة
يتم تأكيد مدة الإنتاج والتعبئة وشروط الشحن لكل مشروع بعد الاتفاق على المواصفات والشروط التجارية.
-
warranty1 yearscustomized supportOEM
-
model numberDN8- DN300TechnicForged
-
ConnectivityWeldingshapeEqual
-
head coderoundSurface TreatmentSmooth
-
PressureLow PressureMounting hole diameter0.25 in
-
Pipe Class1000PassAPI
-
CertificationGS
A swage nipple enquiry should define the transition between two pipe ends, including their sizes, alignment and connection preparation. For an NPT connection and Grade B requirement under A53, those details need to be recorded for the selected item. Specify the geometry you need and request a drawing that connects the dimensional and material requirements in one fitting specification.
Define the Swage Geometry at Both Ends
State the required large and small end sizes, their wall thicknesses and the overall fitting length. Identify whether the transition must be concentric or eccentric. For an eccentric requirement, show the alignment and any relevant orientation on the drawing. A single pipe-size label does not define both ends of a swage. Compare the proposed dimensions with the two adjoining pipes so that the intended transition is clear.
Identify NPT and Welding Preparation Separately
If the required connection is NPT, specify the thread form and extent at each end and obtain the corresponding end detail. If a welding connection is required, define that end preparation instead. Describe mixed end arrangements individually where needed. Do not treat a thread description and a welding description as equivalent configurations. The selected-item drawing should identify how each end will join its mating pipe.
Confirm Material and Operating Requirements
State the exact Grade B material requirement under A53 and request traceable material documentation for the proposed nipple. Confirm the manufacturing process separately and identify the applicable standard scope. Name the process medium and record the pressure and service-temperature requirements before requesting operating qualification. Complete the enquiry with one geometry, an end-size pair, wall thicknesses, connection details and material records. This gives a defined basis for assessing the fitting against the installation and service conditions.






معلومات فنية لكل استفسار عن منتج
جهّز المتطلبات قبل التأكيد النهائي للمنتج.
صفحة المنتج هي نقطة البداية. تتم مراجعة الرسوم والعينات والواجهات والمواد والكميات ومتطلبات القبول قبل تأكيد المخزون أو الإنتاج المخصص.
ناقش هذا المنتج في سياق مشروعك.
شارك الرسم والعينة والمرجع والكمية ومعلومات التطبيق. يمكن ترك البنود غير المعروفة مفتوحة للمراجعة.