ERW Carbon Steel Pipe for Petrochemical Refineries
Para sourcing industrial
Prepare uma RFQ mais clara
Inclua os dados abaixo para que a RELIA entenda a peça e alinhe o próximo passo com você.
- Desenho, amostra ou norma de referência
- Classe do material e processo preferido
- Dimensões, tolerâncias e acabamento superficial
- Aplicação, quantidade-alvo e destino
Prazo de produção, embalagem e condições de envio são confirmados por projeto após o acordo de especificações e termos comerciais.
-
InvoicingBy Actual WeightOiled or Non-oiledNon-oiled
-
Section ShapeRoundSurface TreatmentCold Rolled
-
Tolerance±1%Alloy Or NotNon-Alloy
-
ApplicationFluid Pipe, Drill Pipe, Hydraulic Pipe, Gas Pipe, Oil PipeCertificateAPI , ISO 9001
-
Delivery Time8 ~ 14 daysGradecarbon steel
-
Outer Diameter219 - 1066 mmSpecial PipeAPI Pipe, Other, EMT Pipe, Thick Wall Pipe
-
StandardASTMTechniqueERW
This ERW carbon steel pipe enquiry covers petrochemical refineries and hydraulic equipment. Its title uses ASTM, API and High Pressure references without a numbered product specification, actual grade or operating limit. Define the selected service and supporting material requirements before technical acceptance.
Describe the refinery stream and operating conditions
Provide the actual fluid composition, concentration, contaminants, temperature and pressure. Include operating cycles, thermal changes, corrosion conditions and external loads relevant to the process line. Petrochemical wording does not establish compatibility with every chemical stream or qualification for sour fluids or hydrogen.
Identify the required joint configuration, inspection and project acceptance criteria. A hydraulic equipment proposal may need different bore dimensions, finish and cleanliness. Specify those needs separately rather than assuming the pipe is supplied as a finished hydraulic component.
Establish the standard and material evidence
Ask the supplier to identify the numbered ASTM or API specification, edition, selected grade and supply condition. Obtain chemistry, mechanical properties, traceability and ERW weld inspection records. The generic standard names do not demonstrate dual certification or permit a grade to be borrowed from another listing.
The table records cold-rolled processing and non-alloy carbon steel. Clarify the actual production sequence and acceptance basis. API and ISO 9001 certificate labels require documents showing applicable scope. Cold rolling also does not specify a protective coating for the intended environment.
Confirm dimensions and delivery acceptance
The variants combine a 6–20 mm thickness entry with 6 m or 12 m length, while outside diameter is listed as 219–1066 mm. Select one exact combination and clarify the ±1% tolerance basis, straightness, ovality and end requirements. High Pressure provides no numerical capacity. Agree tests, non-oiled preservation, storage, actual-weight invoicing and delivery confirmation for the chosen pipe.






Informações técnicas para cada consulta
Prepare os requisitos antes da confirmação final do produto.
A página é o ponto de partida. Desenhos, amostras, interfaces, materiais, quantidades e aceitação são avaliados antes de confirmar estoque ou produção.
Discuta este produto no contexto do seu projeto.
Compartilhe desenho, amostra, referência, quantidade e aplicação. Pontos desconhecidos podem ficar em aberto.