Double Seal Socket Joint Epoxy Steel Pipe
Para sourcing industrial
Prepare uma RFQ mais clara
Inclua os dados abaixo para que a RELIA entenda a peça e alinhe o próximo passo com você.
- Desenho, amostra ou norma de referência
- Classe do material e processo preferido
- Dimensões, tolerâncias e acabamento superficial
- Aplicação, quantidade-alvo e destino
Prazo de produção, embalagem e condições de envio são confirmados por projeto após o acordo de especificações e termos comerciais.
-
InvoicingBy Theoretical WeightOiled or Non-oiledSlightly Oiled
-
Section ShapeRoundSurface TreatmentHot Rolled
-
Tolerance±15%Alloy Or NotNon-Alloy
-
ApplicationFluid Pipe, Boiler Pipe, Drill Pipe, Hydraulic Pipe, Gas Pipe, Oil Pipe, Chemical Fertilizer Pipe, Structure PipeCertificateCE, ISO 9001
-
Delivery Time31 ~ 45 daysGradecarbon steel
-
Outer Diameter150 - 350Processing ServiceWelding, Punching, Cutting, Bending, Decoiling
-
Special PipeAPI Pipe, EMT Pipe, Thick Wall PipeStandardASTM
This double-seal socket-joint epoxy steel pipe enquiry concerns industrial water supply. The title describes fusion-bonded painted epoxy, high pressure and corrosion resistance, while the options provide thickness 1.2 and three lengths. Confirm the finished pipe, joint and coating specification before selecting a supply configuration.
Confirm units for thickness and outside diameter
The available lengths are 12 m, 6 m and 6.4 m. Thickness 1.2 has no stated unit, and the table outer-diameter range 150–350 also lacks a unit and individual allocation. Request actual outside diameter, bore, wall thickness and dimensional units rather than assuming millimetres.
Allocate the listed ±15% tolerance to its intended property and agree acceptance limits for length, wall, roundness and straightness. Obtain the complete steel designation, manufacturing route, condition, heat traceability and applicable ASTM document. Generic ASTM or API/EMT labels do not identify a certified specification.
Define both seals and the finished epoxy system
Request socket geometry, insertion depth, engagement, seal dimensions/material, assembly method and joint inspection requirements. Agree compatibility with the transported medium. A double-seal description alone does not establish pressure performance, allowable movement or an approved installation procedure.
Confirm fusion-bonded epoxy construction, internal/external coverage, surface preparation, coating thickness, cure and inspection. Reconcile Hot Rolled and Slightly Oiled entries with the finished coating and end-surface requirements. Surface appearance or corrosion-resistant wording cannot replace documented coating acceptance.
Approve the selected water-supply duty
State actual medium, pressure, temperature, cycling, exposure and loads; request potable-water approval if relevant. Other listed industrial applications need separate assessment. Verify the scope and validity of CE/ISO 9001 references, then agree joint testing, handling, marking, material/coating records and quotation scope.






Informações técnicas para cada consulta
Prepare os requisitos antes da confirmação final do produto.
A página é o ponto de partida. Desenhos, amostras, interfaces, materiais, quantidades e aceitação são avaliados antes de confirmar estoque ou produção.
Discuta este produto no contexto do seu projeto.
Compartilhe desenho, amostra, referência, quantidade e aplicação. Pontos desconhecidos podem ficar em aberto.