ASME / ANSI B16.5 A105 Carbon Steel Slip-On Flange Enquiry
산업 소싱용
명확한 RFQ 준비
RELIA가 부품을 이해하고 다음 단계를 논의할 수 있도록 아래 정보를 포함하세요.
- 도면, 샘플 또는 참고 표준
- 재질 등급 및 선호 공정
- 치수, 공차 및 표면 처리
- 용도, 목표 수량 및 목적지
생산 일정, 포장 및 운송 조건은 사양과 거래 조건 합의 후 프로젝트별로 확정됩니다.
-
warranty1 Yearcustomized supportOEM, ODM
-
model numberflange 2104TechnicCasting
-
ConnectivityFemale/MaleshapeReducing
-
head codeRoundSurface TreatmentSmooth
-
Mounting hole diameter0.25 inPipe Class150
The slip-on flange enquiry in this listing combines A105 carbon-steel and ASME/ANSI B16.5 requirements. Its first decision is the actual model and pipe-to-bore fit. Mixed flange and blank forms appear in the photographs, so a selected section drawing is needed before assigning a slip-on construction to a particular size and material option.
Match the slip-on bore to the pipe
State nominal pipe size, outside diameter and wall thickness, then obtain the offered bore dimensions and required joining locations. Explain the dimensional basis of the millimetre options. If reducing geometry is required, define the specific pipe and bore relationship on the drawing; the Reducing field alone does not establish that configuration. Check flange thickness, outside diameter and any applicable hub dimensions against the adjoining pipe and installation space. The Female/Male and Round labels do not replace a measured section.
Specify the face and complete bolt pattern
Identify the required sealing-face geometry and finish, bolt circle, hole count and hole diameters. Smooth does not qualify a sealing finish, and one mounting-hole value cannot define the full drilling pattern. Match the mating flange, gasket and bolting to the selected face and assembly procedure. Confirm the applicable B16.5 edition, class and dimensional and inspection criteria; the ASME/ANSI wording should be clarified within one agreed acceptance specification.
Verify A105 and the finished joint
Choose carbon steel for the A105 requirement and request its full material specification and traceable records. Stainless-steel alternatives need separate grade selection. Manufacturing evidence must resolve the process description before a forged route is accepted. Provide fluid, pressure, temperature and corrosion conditions and agree joining and inspection requirements. Pipe Class 150 alone is not a documented allowable-duty limit. Tie acceptance to the selected fit drawing and matching material, production and complete-joint records.






모든 제품 문의에 필요한 기술 정보
최종 제품 확정 전에 요구사항을 준비하세요.
제품 페이지는 출발점입니다. 재고 매칭 또는 맞춤 생산 확정 전에 도면, 샘플, 인터페이스, 소재, 수량, 검수 요구사항을 검토합니다.
프로젝트 상황에 맞춰 이 제품을 상담하세요.
도면, 샘플, 참조품, 목표 수량, 용도 정보를 공유하세요. 미확정 항목은 검토 상태로 둘 수 있습니다.