Tube for Nuclear Reprocessing and Heat Exchangers
산업 소싱용
명확한 RFQ 준비
RELIA가 부품을 이해하고 다음 단계를 논의할 수 있도록 아래 정보를 포함하세요.
- 도면, 샘플 또는 참고 표준
- 재질 등급 및 선호 공정
- 치수, 공차 및 표면 처리
- 용도, 목표 수량 및 목적지
생산 일정, 포장 및 운송 조건은 사양과 거래 조건 합의 후 프로젝트별로 확정됩니다.
-
InvoicingBy Actual WeightOiled or Non-oiledNon-oiled
-
Section ShapeRoundSurface TreatmentCold Rolled
-
Tolerance±1%Alloy Or NotNon-Alloy
-
ApplicationFluid Pipe, Drill Pipe, Hydraulic Pipe, Gas Pipe, Oil PipeCertificateAPI , ISO 9001
-
Delivery Time8 ~ 14 daysGradestainless steel
-
Outer Diameter219 - 1066 mmSpecial PipeAPI Pipe, Other, EMT Pipe, Thick Wall Pipe
-
StandardASTMTechniqueERW
This tube listing references Monel 400, seamless construction, nuclear fuel reprocessing and heat-exchanger use. The table instead includes stainless steel, Non-Alloy and ERW. Confirm the actual supply identity and selected project requirements before treating the material or application wording as a verified product qualification.
Resolve Monel material and tube production evidence
Request the actual material specification, grade, condition, traceability and inspection documents. Monel and stainless classifications cannot both define one verified supplied grade without clarification. Establish seamless or ERW production through manufacturing records. The bundled tubular forms with blue end protectors in the original photograph do not identify composition or route.
Identify the applicable project specification, edition, product coverage and conformity package. Nuclear fuel reprocessing wording does not establish nuclear approval or a safety classification for the offered tube. General ASTM, API and ISO 9001 labels likewise require actual scope and order-linked evidence rather than being accepted as project certification.
Define geometry for the selected process position
The two variants list a thickness range of 6–20 mm and lengths of 12 m or 6 m. Specify actual outside diameter, bore, wall and length for the process or exchanger drawing. Reconcile the broad 219–1066 mm outside-diameter entry with the selected position and mating components.
Set straightness, roundness, ends and connection criteria. Clarify which dimension the ±1% tolerance covers and how acceptance will be measured. Confirm the actual Cold Rolled finish, Non-oiled condition, cleanliness and preservation. Protector colour and dark appearance do not establish corrosion resistance, internal cleanliness or dimensional fit.
Agree traceable project acceptance before selection
State the actual medium, contaminants, pressure, temperature, cycles, exposure and joint requirements. Review the documented material condition, route and geometry against the selected duty. Agree material, dimensional, surface, end and required project tests with criteria and traceable reports. Confirm marking, packaging and the required documentation before approving the supply for its intended position.






모든 제품 문의에 필요한 기술 정보
최종 제품 확정 전에 요구사항을 준비하세요.
제품 페이지는 출발점입니다. 재고 매칭 또는 맞춤 생산 확정 전에 도면, 샘플, 인터페이스, 소재, 수량, 검수 요구사항을 검토합니다.
프로젝트 상황에 맞춰 이 제품을 상담하세요.
도면, 샘플, 참조품, 목표 수량, 용도 정보를 공유하세요. 미확정 항목은 검토 상태로 둘 수 있습니다.