A105 Carbon Steel Blind Flange for Water Supply
산업 소싱용
명확한 RFQ 준비
RELIA가 부품을 이해하고 다음 단계를 논의할 수 있도록 아래 정보를 포함하세요.
- 도면, 샘플 또는 참고 표준
- 재질 등급 및 선호 공정
- 치수, 공차 및 표면 처리
- 용도, 목표 수량 및 목적지
생산 일정, 포장 및 운송 조건은 사양과 거래 조건 합의 후 프로젝트별로 확정됩니다.
-
Surface TreatmentPolishedApplicationIndustrial Equipment
-
Bolt Hole Diameter1/2"Bolt Hole Quantity4
This industrial water supply listing describes an A105 carbon steel blind flange with a GOST standard reference. The actual catalog includes a Carbon Steel and Blind Flange combination among other options. Select the intended closure and confirm the governing requirements before using the title as a purchase specification.
Define the water-system closure
Provide the mating flange designation, required size, pressure class and facing. Specify the blind thickness, bolt circle, hole count and diameter together with the gasket and bolting arrangement. The four half-inch holes shown in the table should be checked against the actual selected drawing.
The shared 1/2–120 inch range spans several materials and nine flange type labels. Confirm the exact blind flange configuration and availability; connection, orifice and spectacle blind options do not automatically provide the same closure. Plate wording in the title does not establish the production route or a measured thickness.
Verify the GOST and A105 references
Request the numbered GOST specification, edition and applicable requirements for the proposed blind flange. The broad standard label does not identify a complete dimensional or acceptance package. Confirm the actual material specification and records supporting the A105 designation rather than assuming equivalence or dual conformity.
Obtain the material grade, condition, chemistry and traceability, together with the inspections required by the selected purchase standard. Clarify the intended surface condition beyond Polished. A finish label alone does not establish a coating system or corrosion performance in the water environment.
Assess industrial water duty and supply acceptance
State operating pressure, temperature, cycles, water chemistry, treatment and relevant contaminants or external exposure. Industrial water supply wording does not establish potable-water approval. Review the selected material and assembled joint against the actual requirements, then confirm marking, preservation, quantity, inspection documents and delivery timing for the approved closure.






모든 제품 문의에 필요한 기술 정보
최종 제품 확정 전에 요구사항을 준비하세요.
제품 페이지는 출발점입니다. 재고 매칭 또는 맞춤 생산 확정 전에 도면, 샘플, 인터페이스, 소재, 수량, 검수 요구사항을 검토합니다.
프로젝트 상황에 맞춰 이 제품을 상담하세요.
도면, 샘플, 참조품, 목표 수량, 용도 정보를 공유하세요. 미확정 항목은 검토 상태로 둘 수 있습니다.