Carbon Steel Welded Equal Tee for HVAC and Sprinklers
산업 소싱용
명확한 RFQ 준비
RELIA가 부품을 이해하고 다음 단계를 논의할 수 있도록 아래 정보를 포함하세요.
- 도면, 샘플 또는 참고 표준
- 재질 등급 및 선호 공정
- 치수, 공차 및 표면 처리
- 용도, 목표 수량 및 목적지
생산 일정, 포장 및 운송 조건은 사양과 거래 조건 합의 후 프로젝트별로 확정됩니다.
-
warranty1 Yearcustomized supportOEM
-
TechnicFORGEDConnectivityWelding
-
shapeEqualhead codeHexagon
-
Overall LengthCustomized SizeHeightCustomized Size
-
Surface TreatmentPaintingPressureHigh Pressure
-
System of MeasurementMetricMounting hole diameterCustomized Size
-
Pipe FeaturesOtherPipe ClassOther
-
ApplicationOtherThread TypesCustomized Size
This carbon steel welded equal tee listing targets HVAC and sprinkler piping with a fire-protection reference. The selectable type is labeled Reducer, although the title and original image support a tee family. Confirm the actual component and system duty before assigning dimensions or accepting an approval status.
Identify the ordered tee and connection package
Provide run and branch sizes, bore, outside diameters, wall requirements and center-to-end dimensions on the approved drawing. Confirm Equal geometry and the selected option mapping. Define actual welding ends, mating-pipe details and tolerances for the assembly instead of treating the broad size range as a finished configuration.
Agree explicit units and dimensional inspection criteria; Metric, Hexagon and Customized Size entries do not supply measured values. Clarify the Welded wording against connection and production scope. Obtain actual manufacturing evidence supporting the Forged table entry, together with supplied grade, condition, traceability and material inspection records.
Separate HVAC duty from sprinkler approval requirements
Identify which system the selected order will serve and its actual acceptance requirements. HVAC use and fire sprinkler use do not establish the same approval package automatically. Confirm any required listing, fire-service approval, testing and project documentation for the specific component rather than relying on application words in the title.
Specify the Painting treatment, covered surfaces, surface acceptance and inspection requirements. The dark image does not establish coating chemistry or protective performance. Agree preservation and handling requirements with the material, dimensional and end records needed for acceptance of the ordered fitting before it is installed.
Set the actual system operating conditions
State medium composition, treatment chemicals, temperature, pressure, cycles, transients, external loads and joint requirements. High Pressure and Other class do not provide numerical allowable limits. Evaluate the confirmed material, geometry and surface package against the selected system duty, then agree inspection documentation, marking, protection and delivery before approval.





모든 제품 문의에 필요한 기술 정보
최종 제품 확정 전에 요구사항을 준비하세요.
제품 페이지는 출발점입니다. 재고 매칭 또는 맞춤 생산 확정 전에 도면, 샘플, 인터페이스, 소재, 수량, 검수 요구사항을 검토합니다.
프로젝트 상황에 맞춰 이 제품을 상담하세요.
도면, 샘플, 참조품, 목표 수량, 용도 정보를 공유하세요. 미확정 항목은 검토 상태로 둘 수 있습니다.