A105 Class 300 Slip-On Flange for Fire Protection
산업 소싱용
명확한 RFQ 준비
RELIA가 부품을 이해하고 다음 단계를 논의할 수 있도록 아래 정보를 포함하세요.
- 도면, 샘플 또는 참고 표준
- 재질 등급 및 선호 공정
- 치수, 공차 및 표면 처리
- 용도, 목표 수량 및 목적지
생산 일정, 포장 및 운송 조건은 사양과 거래 조건 합의 후 프로젝트별로 확정됩니다.
-
Surface TreatmentPolishedApplicationIndustrial Equipment
-
Bolt Hole Diameter1/2"Bolt Hole Quantity4
This industrial fire protection listing describes a carbon steel slip-on flange with A105, Class 300 and ASME B16.5 references. The selectable Carbon Steel slip-on option supports that component family. Confirm the actual material, drawing and system acceptance requirements before specifying it for a fire protection installation.
Check slip-on dimensions and standard scope
Provide the pipe dimensions and selected flange drawing, including bore, fit, hub geometry, thickness, facing and complete bolt pattern. Establish the welding and inspection requirements under the project specification. A slip-on selection does not provide a universal connection detail for every pipe or operating condition.
Confirm the applicable ASME B16.5 edition and required size/class combination. The shared 1/2–120 inch range does not demonstrate that this standard covers every listed size or that all combinations are available. Verify the four half-inch holes in the table against the actual mating flange.
Verify A105 and Class 300 acceptance
Request material records supporting A105, with the required condition and traceability. The generic Carbon Steel choice is not a supplied material certificate. Define the finish and inspection criteria behind Polished, particularly where the mating joint requires specific surface acceptance.
Class 300 does not mean a universal 300 psi operating limit. Review the pressure-temperature requirements for the actual material, flange and joint. Confirm the dimensional and material evidence required by the purchase specification rather than treating standard names in the title as proof of conformity.
Establish fire protection project requirements
State the system medium, pressure, temperature, transients and cycles, together with any required project approval or listing evidence. Fire protection application wording does not establish such approval. Assess the selected component against the actual system requirements, then agree inspections, documentation, marking, preservation, quantity and delivery for the specified slip-on flange.






모든 제품 문의에 필요한 기술 정보
최종 제품 확정 전에 요구사항을 준비하세요.
제품 페이지는 출발점입니다. 재고 매칭 또는 맞춤 생산 확정 전에 도면, 샘플, 인터페이스, 소재, 수량, 검수 요구사항을 검토합니다.
프로젝트 상황에 맞춰 이 제품을 상담하세요.
도면, 샘플, 참조품, 목표 수량, 용도 정보를 공유하세요. 미확정 항목은 검토 상태로 둘 수 있습니다.