B16.9 A234 WPB SCH40 Steel Pipe Tee Enquiry

링크 복사 완료

산업 소싱용

명확한 RFQ 준비

RELIA가 부품을 이해하고 다음 단계를 논의할 수 있도록 아래 정보를 포함하세요.

  • 도면, 샘플 또는 참고 표준
  • 재질 등급 및 선호 공정
  • 치수, 공차 및 표면 처리
  • 용도, 목표 수량 및 목적지

생산 일정, 포장 및 운송 조건은 사양과 거래 조건 합의 후 프로젝트별로 확정됩니다.

상품 설명
  • warranty
    1 years
    customized support
    OEM
  • model number
    1/2"
    Technic
    Forged
  • Connectivity
    Welding
    shape
    Reducing
  • head code
    Hexagon
    Surface Treatment
    Painting
  • Mounting hole diameter
    0.17 in
    Pipe Class
    150
  • Body material
    Carbon Steel
    Packing
    Wooden Case
  • Surface treatment
    Black Painting
    Type
    Butt Welded
  • Size
    1/2"-48"
    Certification
    Gs

A pipe tee enquiry with B16.9, A234 WPB and SCH40 requirements should connect those references to a selected three-port fitting. Confirm the branch arrangement and dimensional specification before evaluating material or conformity records. The useful evidence is a drawing and supporting documentation that describe the same proposed tee.

Resolve the Branch Arrangement and Size Mapping

State whether the branch should match the run size or reduce to another size, then specify both run connections and the branch. Give the nominal sizes, mating pipe outside diameters and wall requirements for all three interfaces. Where the project calls for a 32 mm fitting, clarify the size convention and obtain a selected-model dimensional map. A half-inch model label or broad size range does not resolve the complete tee configuration.

Document WPB Material and SCH40 Construction

Identify the exact material specification and WPB requirement and request traceable records for the quoted tee. Define the schedule convention and obtain the actual wall mapping for each connection. Specify the manufacturing route, including seamless construction if required, and obtain production evidence. Identify the required butt-weld preparation and applicable B16.9 edition, with the dimensional and conformity records needed by the project.

Confirm Design and Certification Evidence

Provide the fluid, operating pressure and temperature together with joint and fabrication requirements. Ask for the documented design basis covering the selected material, geometry and completed joints. Any required certification should identify the scheme, scope and supporting record; an abbreviation alone does not establish certification. Complete the enquiry with the approved branch drawing, size and wall mapping, material and production records, conformity scope and qualified service limits.

모든 제품 문의에 필요한 기술 정보

최종 제품 확정 전에 요구사항을 준비하세요.

제품 페이지는 출발점입니다. 재고 매칭 또는 맞춤 생산 확정 전에 도면, 샘플, 인터페이스, 소재, 수량, 검수 요구사항을 검토합니다.

프로젝트 상황에 맞춰 이 제품을 상담하세요.

도면, 샘플, 참조품, 목표 수량, 용도 정보를 공유하세요. 미확정 항목은 검토 상태로 둘 수 있습니다.

소싱 검토용 관련 상품

ERW Carbon Steel Fire Protection Pipe SCH10/SCH40
Forged Carbon Steel Tee for Pressure-Vessel Piping
ASME B16.11 Class 6000 Carbon Steel BW/SW/Threaded Branch Outlet Enquiry
API 6D Trunnion Mounted Ball Valve Enquiry
배관용 이중 플랜지 신축식 탄소강 분해 이음 및 커플링
Sockolet Outlet for Instrumentation Connections
배관 피팅용 내후성 고무 저압 EPDM 덕빌 체크 밸브
도매가 금속 강재 플랜지 플렉시블 고무 신축 이음